Cible Ponts Roulants has installed two OMIS double-girder overhead cranes, each with a lifting capacity of 10 tonnes, for an undisclosed client. The installation has a span of 18,280 mm.
Both cranes feature a Master/Slave control system, enabling them to function in synchronisation. This configuration is intended to coordinate the movements of the cranes when managing long or bulky loads, allowing for variable speed across all actions.
The project reflects the importance of coordinated lifting systems in industrial operations. Similar dual-crane arrangements can support the handling of long and heavy materials in India’s steel, manufacturing, and engineering sectors.





